Date
Tuesday, September 10, 2024
Time
1:30 PM - 2:00 PM
Location Name
KICC M109/110 (Level 1)
Name
Case Study: Using Online GIS to Build Efficiencies from Start to Finish to Meet I/I Reduction Goals
Track
Rehabilitation - WW
Description

For many years many utilities have been chasing I/I removal from their wastewater systems. Technology has progressively improved, opening the opportunity for various sets of online tools to be utilized to assist with the design, communicate with the owner, and track construction progress. All of these tools can be combined to build inherent efficiencies into project workflows to ensure that I/I removal goals are met within budget and on time. This paper will explore one such project as a case study where the online tools were developed in the beginning with a Sanitary Sewer Evaluation Survey and carried all the way through construction and even utilized during a post construction flow monitoring study to measure the success of the project.